The emergence of the excavator supper long front boom is to better cope with hard-core projects. The so-called hard-core projects are those projects with high working conditions, but no matter how difficult it is, we can’t make it difficult for us. After all, we can now extend the excavator to a certain length is specially designed to cope with these difficult working conditions, such as the construction of high-speed rail lines, construction of resettlement areas in mountainous areas, and other large-scale projects, rather than small repairs and small repairs.
Because small projects can’t be used and do not need to use advanced excavating equipment such as excavator supper long front boom, the difficult working conditions not only have a high technical test for the operator, but also require high operating performance of the excavator extension arm. The excavator cannot meet the high-strength and high-demand operations like the lengthened arm of the excavator, and the funds for small projects are limited, and the standard-boom excavator can only be used. In addition, the difficulty of the project is low, and the standard-boom excavator has been It is good enough to complete the engineering task. The actual role of the excavator in the project is the reason for the hard core project. The excavator supper long front boom has good working ability. This feature can enable people to expand the scope of work in a large area of operation and reduce the movement of the excavator itself. Increase the digging distance.
Therefore, in many projects, the use of excavator supper long front boom can save a lot of time and cost for the project.Such a large machine is followed by deep digging capacity. Excavators with supper long front boom can be described by the term “adding wings”. This deep digging capacity can meet the fixed needs of large projects. Therefore, such an excavator with supper long front boom is very practical.